Flood protection Mühldorf

Project description

In recent years, Mühldorf has been repeatedly plagued by floods. Now a flood protection wall is being built on the south bank of the Inn from the racecourse along the sewage treatment plant to the high bank at Teufelsgraben. The wall will be made of steel sheet piles up to 8 metres long. The total cost of this project is estimated at about 5 million euros.

Client

Wasserwirtschaftsamt Rosenheim

Timeframe

2019 – 2020

Project share WERNER CONSULT

Project planning Lph 2 to 8 as well as local construction supervision